|
Who's Online
There currently are 292 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
 |
|
There are currently no product reviews.
 ;
I liked the price plus it had everything i needed to service the tv.
thankyou Tim Hertz
 ;
The manual is excellent, well detailed, and divided into two parts. Received very quickly. Thank you.
 ;
a solid deal - quick and without any problems.
I life in europe - with downloads no loosing time
once again
 ;
got exactly what i ordered in a very timely manner. will use again for other manuals
 ;
I'm happy. Good quality. Very helped me with my work..............................
2.5 CHECKUP AND ADJUSTMENT OF MECHANISM PHASE
<Rotary encoder> Set the âIâ of the rotary part at the tapped hole as shown in the figure.
<Connect gear> (Note 2) Set the connect gear so that its locating hole meets the hole on the main deck assembly.
<Worm wheel> (Note 2) Set the worm wheel so that its locating hole meets the hole on the main deck assembly.
Note 1 <Main cam gear /Brake control plate> After fitting the main cam gear and brake control plate together,set them together so that their locating holes meet the hole on the main deck assembly.
<Connect gear 2> (Note 2) Set the connect gear 2 so that its locating hole meets the hole on the main deck assembly.
<Sub cam gear> Set the sub cam gear so that its locating hole meets the hole on the main deck assembly. This state represents that the mechanism is in the EJECT mode, which is the âmechanism assembly modeâ.
Note 1: Since the connect gear 2 is tightly fixed to the main deck by caulking, adjust its phase with the connect gear and sub cam gear.
Note 2: The part that needs phase adjustment by the hole on the main deck assembly must exactly be set as the specified phase. There is a fear that some part is installed in a wrong phase because assembling of the mechanism is automated. If so, set every part in the correct phase whenever the mechanism is reassembled.
Fig. 2-5-1
2-15
|
|
 |
> |
|